Barrier Wall and LNAPL Collection System Installation

Location: Red Earth, AB

QMLP was awarded a project at a bulk fuelling facility in northern Alberta to install a barrier wall to mitigate the off-site migration of LNAPL and associated skimmer packages to collect LNAPL from the groundwater surface.

The scope of work included the following:

  • Preparation of a site specific Health and Safety Plan;
  • Procurement and preparation of 125 lm, 4m deep PVC sheet piles;
  • Design of an installation methodology and QA/QC controls to ensure proper installation;
  • Installation of 125 lm, 4m deep PVC sheet pile wall;

Design, procurement, installation and commissioning of 7 fully-enclosed, insulated LNAPL skimmer packages to collect LNAPL from the groundwater surface. The heated enclosures permit year round operation of the skimmer unit.